A first article inspection report from a 3D scan: building the characteristic table

A first article inspection is an exercise in accountability: every characteristic on the drawing, numbered, with a requirement and a result. How that table is built from a ballooned drawing and a scan, what to do with the rows a scan cannot fill, and where the AS9102 forms begin.

What the table has to account for

A first article inspection (FAI) demonstrates that the production process can make the part to the drawing. Its core is a table in which every design characteristic appears once: a characteristic number, where it is on the drawing, the requirement, and the result. In aerospace the layout is given by AS9102 Form 3; other industries use their own sheets, and the logic is the same.

The hard part is completeness. A table with a wrong value will be caught in review; a table with a missing row usually will not. The method below is built around not losing rows.

Numbering from the drawing

The Drawing Inspector reads the PDF drawing and detects its dimensions, tolerances, feature control frames and datum flags. When the customer has already ballooned the drawing, those numbers are adopted as they are, so the table uses the customer's characteristic numbers. Otherwise the drawing is ballooned automatically. General tolerances are read from the note on the sheet, so untoleranced dimensions enter the table with a requirement as well.

Features that repeat — eight holes on a pattern — share one balloon with instance suffixes (5_1 … 5_8), and each instance is a row with its own result.

Measuring, and the rows a scan cannot fill

Each balloon is linked to the CAD geometry and measured on the scan: sizes, distances, angles and geometric tolerances in the datum frame the drawing states. A characteristic the scan cannot support is refused with a reason — no coverage under the feature, a tolerance tighter than the mesh can resolve — and stays in the table as an open row. It is not dropped and it is not given a nominal value.

Those rows, and the requirements no scan answers at all — threads, surface finish, notes — are completed with the instrument that fits them. The report table has type, instrument and notes columns, so a bore checked with a plug gauge or a characteristic taken on the CMM is documented in the same table beside the scanned ones.

  • Measured on the scan: requirement, nominal, tolerance, value, deviation, status
  • Refused on the scan: N/A with the reason, row kept
  • Verified by other means: value and instrument entered in the same table

What goes into the report

The report is ordered by balloon number, so it reads in the order of the ballooned drawing. Position rows carry their coordinate sub-rows; roundness and profile rows carry their plots; a snapshot of the 3D view can be placed beside its balloon. A coverage page checks the rows against the balloons of the drawing and lists any balloon without a row. Output is PDF, Excel, CSV and HTML, in millimetres, inches or both.

Where the AS9102 forms begin

AS9102 defines three forms. Form 1 identifies the part and its sub-assemblies; Form 2 accounts for materials, special processes and functional tests. Both describe your organisation and its supply chain and are completed by you. Form 3 is the characteristic table — and this is the data Ai-Inspect produces: number, requirement, result and status, row by row.

The Excel and CSV exports are intended for transfer into your own Form 3 template or quality system. The forms themselves, the references to nonconformance documents and the signatures remain your organisation's documents.

A new revision, or the next first article

The inspection is saved as a program. When the part is made again, the program runs on the new scan and the table is produced in the same order with the same numbers. When the drawing changes, the affected steps are edited — a nominal, a tolerance or a balloon number changed in the report table is written back into the program — and the steps that do not apply can be disabled, which suits an inspection limited to the characteristics a change affected.

Questions this article answers

It generates the characteristic results that Form 3 is filled from, as Excel, CSV and PDF. Forms 1 and 2 and the signed forms are prepared by your organisation.

That depends on the customer's requirements and on the scanner: the tolerance should be clearly larger than the scanner's stated accuracy. The report states how each row was obtained, and rows the scan cannot support are left for another instrument.

Yes. Reports can be produced in millimetres, inches or mixed units.

See it on your own parts

Bring a drawing, a CAD model and a scan — we will run the inspection with you in a guided demo.